Thursday, September 17, 2009

Weeks 18 thru 20 - Aug 31 thru Sept 17

My house of many colors-just like the vinyl siding-
the shutters are different colors at different times of the day
The sprinkler system is going in.
The driveway gravel has been graded.
The curbing for the driveway is in.
Before the curbing was finished.
The landscaping has started.
Taping the garage.
Painting the window trim.
When I said that the painting was done,
I forgot about the window, door, and baseboard trim.
Pantry shelves are in.
Putting a beam on the vault line in the greatroom.
It's stained the same color as the cabinets & bookcases.
It looks really good.
Base for the electric fireplace.
The front will be rounded slightly.
The bookcases are being installed.
An arch to connect the 2 sections of bookcases.
Master bathroom vanity and linen closet.
Kitchen cabinets around the fridge.
The doors will be on soon.
Cabinets around the stove.
Master closet shelves being built.
That was a lot of fence to paint.
Lighting and fans going in.
Recessed lighting over the kitchen area.
Lighting in the Master bath.
Sitting room fan.
Master bedroom fan. It's huge. I really like it.
Shelves built in the pantry.
Trim(base board) in the bedrooms.
It still needs to be painted. Lots of trim to be painted!